Field Building

Results: 947



#Item
281

Capacity Building in the Field of Youth Project Handbook Selection 2014 Round 1 – Round 2

Add to Reading List

Source URL: eacea.ec.europa.eu

Language: English - Date: 2014-12-09 09:14:49
    282Baseball field / Data / Information / Physics / Abstract algebra / Dimension / Lumber

    CNBT 1411 CONSTRUCTION METHODS & MATERIALS BASIC STEPS TO BUILDING LAYOUT Setback dimensions, foundation width and length, diagonal measurement and property lines should be determined before proceeding. 1. Using setback

    Add to Reading List

    Source URL: www.austincc.edu

    Language: English - Date: 2008-12-02 23:32:31
    283

    Project Number: 2014-XXXX KA2 – Cooperation for innovation and the exchange of good practices -Capacity Building in the field of Youth Erasmus+

    Add to Reading List

    Source URL: eacea.ec.europa.eu

    - Date: 2014-11-25 08:21:36
      284Fracture mechanics / Structural engineering / Mechanical engineering / Fatigue / Structural engineer / Structural load / Structural analysis / Engineering / Building engineering / Construction

      Structural engineering Full service capability in the field of structural design and integration, stress analysis, structural integrity investigation, and structural testing within an EASA-approved design organisation.

      Add to Reading List

      Source URL: www.ruag.com

      Language: English - Date: 2014-11-14 09:17:28
      285Robot / Enthiran / Reason / Three Laws of Robotics / Film / Cinema of India / Science fiction

      PRE - Scene 1/ Day: Outside – fields What looks like a human female ‘wakes up’ alone in a field and slowly stumbles towards building. She goes inside. Scene 1/ Day: Inside – library, studio, bar ROBOT (the woman

      Add to Reading List

      Source URL: www.thebigconversationspace.org

      Language: English - Date: 2013-12-30 13:00:58
      286Erasmus Mundus / Knowledge / Erasmus Programme / TEMPUS / Desiderius Erasmus / Interreg / Educational policies and initiatives of the European Union / Education / Academia

      Key Action 2: Cooperation for innovation and the exchange of good practices - Capacity-building projects in the field of higher education FREQUENTLY ASKED QUESTIONS Selection -1st Call[removed]EAC-A04-2014)

      Add to Reading List

      Source URL: eacea.ec.europa.eu

      Language: English - Date: 2015-01-30 11:30:59
      287

      Erasmus+ Programme Key-Action 2: Cooperation for innovation and the exchange of good practices - Capacity building in the field of youth[removed]Selection Round 2 - awarded applications N°

      Add to Reading List

      Source URL: eacea.ec.europa.eu

      Language: English - Date: 2014-12-08 09:35:53
        288Road construction / Pavement engineering / Building materials / Asphalt / Road surface / Base course / Rut / Road / NCAT Pavement Test Track / Transport / Land transport / Construction

        مرفق1 : نموذج للملخصات البحثية إنجليزي Title Laboratory and field study of pavement rutting in Saudi Arabia Author-s Anani, Bassam A., Balghunaim, Fahad A., Al-Hazzaa, Abdulrahman S.

        Add to Reading List

        Source URL: repository.ksu.edu.sa

        Language: English - Date: 2011-04-26 16:27:22
        289Sociology / Socioeconomics / Capacity building / Agricultural extension / Program evaluation / Farmer Field School / Association for the Development of Pakistan / Institute of Rural Management / Development / Rural community development / Evaluation

        1 EXECUTIVE SUMMARY The present mission was organised in October 2009, in order to implement the mid-term evaluation of the 4-year Quand Dien Local Development Project located in Quang Dien District of Thua Thien Hue

        Add to Reading List

        Source URL: han.luxdev.lu

        Language: English - Date: 2014-03-04 04:25:04
        290Sociology / Socioeconomics / Capacity building / Agricultural extension / Program evaluation / Farmer Field School / Association for the Development of Pakistan / Institute of Rural Management / Development / Rural community development / Evaluation

        1 EXECUTIVE SUMMARY The present mission was organised in October 2009, in order to implement the mid-term evaluation of the 4-year Quand Dien Local Development Project located in Quang Dien District of Thua Thien Hue

        Add to Reading List

        Source URL: pri.luxdev.lu

        Language: English - Date: 2014-03-04 04:25:04
        UPDATE